A 10-house cage free aviary system was commissioned at a layer farm in USA across roughly 70 days on site between February and April. Each two-tier house holds approximately 8,000 laying hens on a 36 m by 9.2 m steel structure, and every house feeds its eggs onto a belt that runs to a four-section central egg collector serving the farm’s egg store. The project was the farm’s first ten houses out of a planned fifty, which makes it a useful reference for anyone evaluating an aviary layout at a similar scale.

FeatureDetail
Project typeCage free aviary system with central egg collection
LocationUSA
Houses delivered10 (about 40 further houses planned by the same farm)
Capacity per houseApproximately 8,000 laying hens
House structureSteel structure, 36 m clear length by 9.2 m clear width, two tiers
Tier heightsFirst tier 550 mm, second tier 650 mm, cage-frame height 1,526 mm
Working systemsCage frame, welfare fittings, manure removal, egg collection, automatic control
Egg flowNest to in-house belt, to egg elevator, to central egg collector, to egg store
On-site schedule16 February to 26 April, about 70 days

Why This American Layer Farm Chose a Cage Free Aviary System

The decision did not start with equipment. It started with the layout of the house itself, because a cage free aviary system changes where the birds are, where the eggs land, and where the manure goes. In a conventional battery layout all three are contained inside one structure. In an aviary they are spread across tiers and aisles, and every one of them has to be collected by machine or the labour saving disappears.

Cage Free Aviary System Layer Houses on the Florida Farm Site
Aviary Layer Houses on the Farm Site

What Changes When Layers Leave the Battery Cage

  • Space and Behaviour Come First, but Handling Comes Second: An aviary gives hens room to move between levels and to use a nest, a perch and a scratch area rather than standing in a fixed cage. That is the point of the system. The engineering consequence is that eggs are laid in nests across two tiers instead of rolling into a single collection channel, so the house needs an egg belt at every tier and a lift to bring the upper tier back down.
  • Three Streams Have to Be Collected Automatically: Once birds are loose across two tiers, three material streams stop being manual work and become machine work: eggs from every nest, manure from under every tier, and feed and water to every tier. That is why an aviary project is specified as a set of systems rather than as a cage.
  • The Slatted Floor Does Double Duty: Under a cage free layout the floor is not just a walking surface. Droppings fall through a plastic slatted floor into a collection channel below, which keeps birds off fresh manure and reduces the disease pressure that wet litter creates. The scraper then moves that material to the end of the house.

The Case for Ten Houses at Once

  • Eight Thousand Birds per House Sets the Unit: Each house in this project was built to hold approximately 8,000 laying hens over two tiers. At that size a single house is already a full production unit, so the farm did not need to prove the concept on one house before committing to a group.
  • Ten Now, Forty More Later: The farm’s wider plan runs to about fifty aviary houses, with roughly forty still to be built. Installing ten at once carried two practical advantages: the interface points between houses — the belts converging on the central collector, and the shared route to the egg store — could be built once at the right geometry instead of being retrofitted house by house, and the same crew learned the assembly sequence on house one and repeated it nine times.
  • Why That Sequence Matters Commercially: For a buyer planning in phases, the first tranche is what fixes the standards for the rest. The house footprint, the tier heights and the discharge points chosen in the first ten houses become the baseline that later houses have to match, which is why the parameters in this report are worth reading before a site is laid out rather than after.

How a Cage Free Aviary System Is Assembled: Six Working Systems

A cage free aviary system is assembled from six working systems that are quoted, shipped and commissioned together: the cage frame, the welfare fittings, the manure removal system, the egg collection system, the automatic control system and the installation scope. Each has its own bill of materials, and the interfaces between them — where the egg belt leaves the tier, where the scraper discharges, where the control cabinet takes its signals — are where a project either runs cleanly or turns into site modifications. The sections below follow that order.

Cage Frame and Galvanized Mesh Structure of a Cage Free Aviary System
Cage Frame and Mesh Structure of the Aviary
Red Nest Curtain on the Laying Nest of a Cage Free Aviary System
Aviary Welfare Structure With Red Nest Curtain

Cage Frame and Welfare Furniture

  • What the Frame Is Made Of: The first frames and middle frames are cast in a magnesium aluminum zinc alloy, and the moving-area mesh and its supports arrive as flat iron and mesh panels — 1,215 mm by 2,440 mm and 1,215 mm by 560 mm — finished by an overall hot-dip galvanizing process for corrosion resistance. The egg pocket mesh measures 1,200 mm by 550 mm, the straw mattress net 1,200 mm by 400 mm, and the baffle plates 2,440 mm by 475 mm. Wire components are drawn from an aluminum zinc alloyed wire, and the cage nails are stainless steel.
  • The Fittings That Make It an Aviary Rather Than a Cage: The welfare package is what distinguishes the system. A habitat structure in 32# hot-dip galvanized pipe carries the perches. Straw mattresses sit on top of the straw mattress net to give the birds a scratch and nest surface. The turnover device provides the laying nest itself, and the egg protection trough catches eggs before they reach the belt. A fig leaf screen closes off the nest front so the birds settle.
  • Why the Materials Are Specified This Way: Ammonia, moisture and abrasion are constant in a layer house, and the parts that fail first are the ones birds stand on and the ones that carry material. Hot-dip galvanizing on the structural steel and stainless steel on the fixings are the two lines of defence; both are visible in the delivered specification rather than left to the installer’s choice.

Manure Removal: Slatted Floor and Scraper

  • The Gravity Half of the System: Droppings fall through a plastic slatted floor under the birds into a collection channel. Nothing is scraped under the birds themselves, and the flock never stands on fresh manure. The channel then becomes the working area for the mechanical half.
  • The Mechanical Half: A scraper style manure removal machine, 30.4 cm high and built in stainless steel with an 8 mm 304-grade cable, runs the channel with a front power device and a tail-end power device. The scraper is pulled by a single cable between corner wheels, and the cable has to sit centred in the channel and run straight — if it drifts, the scraper tilts and starts catching the channel wall.
  • The Belt System Under the Tiers: Manure belts run beneath the tiers. The belt itself is a white polypropylene belt, 1.2 mm thick, specified for low stretch and long service life. The belt support group is a single-tier item, and both the support frame and the side plate are made from an aluminum magnesium zinc alloy with a smooth surface — deliberately, so the belt is not scratched as it runs. At the discharge end, the tail-end power device uses a 275 g/m² alloy side plate on a hot-dip galvanized base, with an injection roller chosen for a high friction coefficient so the belt is gripped rather than slipped.
  • The Setting That Keeps the Scraper Moving: The scraper has to be run at least once a day. If manure is allowed to build up, the scraper cannot push the accumulated mass, and on this project that was the direct cause of a scraper bending and later of blades catching the wall. Daily operation is not a preference; it is the operating condition the machine was designed around.

Feed and Water Lines

  • Timed and Measured, per Tier: Feed and water are delivered to both tiers on automated lines that meter out feed on a schedule rather than leaving it available at all times. This keeps intake controlled, reduces waste, and removes a manual task that scales badly when a house holds thousands of birds. The feed line and the watering line are sized to serve both tiers from a single house-level control point.
  • What This Buys the Operator: Once the poultry feeding systems are on a timer, the daily labour in the house moves from distributing feed to checking that distribution happened. That is the shift an aviary is bought for, and it is the reason feed and water are quoted as systems alongside the cage frame rather than as spare parts.

From Nest to Egg Store: The Central Egg Collection Line

A cage free aviary system is judged on how it handles eggs, because that is the product the farm sells. In this project every house runs a two-stage internal system, and then all ten houses hand their eggs to a single central egg collection line that delivers to the egg store at a steady rate.

In House Egg Belt Conveyor Station With Drive Sprockets in an Aviary House
In House Egg Belt Conveyor Station
Central Egg Collector Inclined Belt Section of the Egg Collection Line
Central Egg Collector Inclined Belt Section

Nest to Belt: The First Leg Inside the House

  • Where the Egg Actually Starts Moving: Hens lay in the turnover nest, and the egg rolls out of the nest onto the collection belt by gravity rather than being picked. That is the reason the nest geometry and the fig leaf screen matter: if the nest is not closed properly or the belt is not aligned, eggs either stay in the nest or arrive at the belt damaged.
  • The In-House Equipment: Each house carries a single-tier egg collecting machine on the top floor and a conveyor belt type machine rated at 500 mm belt width and 15 m length with a turning device. An egg elevator lifts the upper tier back down to the discharge level, and an unqualified egg leaking device diverts cracked or soiled eggs before they join the main flow. The egg collecting belt itself is a 150 mm wide, 140 m long polypropylene belt, carried on 220 anti-ageing belt brackets.
  • Why the Belt Specification Is the Critical Part: An automatic egg collection system runs continuously, so belt behaviour is the difference between clean eggs and cracked ones. A belt that drifts to one side rubs against the steelwork beneath it; on this project that was observed directly, and it is why the belt run is specified with adjustment at both ends rather than relying on a fixed alignment.
  • Two Tiers, One Discharge: Because the house has two tiers, both tiers have to converge before the eggs leave. The upper tier discharges through the elevator into the same flow as the lower tier, and the combined stream then leaves the house on a single conveyor. Matching the two tiers is a geometry problem, and it is checked at commissioning rather than assumed from the drawing.

The Central Egg Collector in Four Sections

  • How It Is Built: The central collector runs the length of the site and is assembled in four sections, arranged with an inclined section where the line climbs to the egg store level. Each section carries its own motor, and each section has its own chain tensioning system — which means a fault in one section stops one section, not the whole line.
  • The Details That Decide Whether It Runs: Three items do most of the work in daily operation. The transition plates have to be set so eggs cross between sections without being nudged off line. The oil cups have to stay filled, because the chain runs continuously and a dry chain wears the sprockets. And the chain has to be kept at the right tension: too loose and it rides, too tight and it loads the motor.
  • The Commissioning Sequence for the Collector: The published procedure for this line is to strip the motor covers and chains first and confirm rotation direction on power-up, then refit the covers and chains. Running a collector without that check is how a section ends up driving backwards after the wiring is complete.

What Happens After the Egg Store

  • The Line Delivers, the Farm Grades: The central collector terminates at the egg store, where eggs enter washing, grading and packing. In this case the farm already operated that downstream equipment as part of its own processing chain, so the aviary project’s responsibility ended at the store inlet — a boundary worth stating explicitly, because it is the point where two suppliers’ systems meet.
  • Where Our Scope Can Extend: For sites that do not yet have the downstream stage, an egg processing system covering the same handover point — receiving eggs from the store inlet chain through to packed trays — can be quoted as one scope so the inlet and outlet are dimensioned together rather than interfaced after the fact.

House Parameters: What a 36 m × 9.2 m Layer House Carries

The parameters below are the ones that decide whether an aviary layout fits a building, and they were the numbers this project was actually built to. They are worth reading as a set, because they constrain each other: tier heights set the cage-frame height, and the cage-frame height sets how much vertical space the egg elevator has to work in.

Plastic Slatted Floor and Manure Channel Under a Cage Free Aviary Cage Frame
Slatted Manure Channel Under the Aviary Cages
Nest Turnover Device Rods and Drive Chain Inside a Cage Free Aviary House
Nest Turnover Rods and Drive Chain Assembly
Perforated Egg Transfer Plate on the Aviary Egg Collection Line
Perforated Egg Transfer Plate Detail

Structural Dimensions and the Two-Tier Layout

ParameterValue
House structureSteel structure
Clear length36 m
Clear width9.2 m
Tiers2
First tier height550 mm
Second tier height650 mm
Cage-frame height1,526 mm
Single cage footprintAbout 2,430 mm by 2,440 mm
Capacity per houseApproximately 8,000 laying hens
  • Why Two Tiers Rather Than Three or Four: Tier count is a trade-off between birds per square metre and how much machinery has to reach into the house. A two-tier layout keeps the egg elevator short and gives the birds more usable vertical space, at the cost of density. Where land is not the constraint — as on this site — two tiers is usually the simpler machine to run.
  • What the Footprint Means in Practice: On a 36 m by 9.2 m clear area, the layout has to accommodate the cage rows, the aisles the birds use, the manure channel under the slats and the egg belt run to the discharge end. Those four uses compete for the same 9.2 m of width, which is why the layer house layout should be settled before the building is poured rather than after the equipment arrives.

Materials in Contact with Birds and Eggs

  • Why Material Choice Is a Specification Item: The parts birds touch and the parts eggs touch are specified separately from the structural steel, because they fail for different reasons. Perches, nest surfaces and the straw mattress net have to resist abrasion and moisture; the egg belt has to stay dimensionally stable so it does not drift; and the manure contact surfaces have to resist corrosion without becoming rough.
  • What Was Actually Used: Structural frames and baffle plates are magnesium aluminum zinc alloy; mesh and supports are hot-dip galvanized flat iron and mesh; wire components including the egg pocket mesh and straw mattress net are aluminum zinc alloyed wire; cage nails are stainless steel; the manure belt is polypropylene at 1.2 mm thickness; and the scraper cable is 8 mm 304-grade stainless steel. Smooth-surfaced alloy is used specifically where the manure belt runs, so the belt is not abraded by its own support.

Commissioning a Cage Free Aviary System: 70 Days on Site

A cage free aviary system takes longer to commission than a conventional cage installation, because the machine count per house is higher: two tiers of belts, a scraped manure channel under each tier, an egg elevator, and connections between the house and the central line. On this project the on-site phase ran from 16 February to 26 April with a crew of about eight, and the record is more useful than a completion certificate because it shows which stages took the time.

ABC Machinery Team Installing a Cage Free Aviary System in Florida
Aviary System Installation Work on Site
Egg Belt Drive Commissioning During Aviary System Installation in Florida
Egg Belt Drive Commissioning on Site

Sequence: Manure System, Cage Frame, Then the Egg Line

  • Why the Manure Channel Goes In First: The manure system is installed before the cage frame because the scraper channel, the corner wheels and the cable all sit under the birds and cannot be reached once the frame is up. On this project the cleaning system was completed first, including the drive units and the corner wheel alignment, and the frame work followed.
  • The Frame Goes Up in Tiers: The first tier was assembled through the frame, mesh, straw mattress, baffle plate and nest stages, and was fully installed and aligned before the second tier started. Levelling the frame at each tier is not cosmetic: if a house is out of level across its width, the nest surfaces tilt and eggs do not roll out reliably.
  • The Egg Line Comes Last: Egg belts, elevators and the connections to the central collector were installed after the frame was aligned, because their alignment depends on the frame they discharge from. The central collector itself was built in its four sections and commissioned section by section.

Egg Belt Alignment: Why the Adjustment Device Is Not Optional

  • What Was Observed: On this project the egg belts on the first houses drifted to one side, and on the upper tier of several houses the belt drifted noticeably at the start of each working day before settling into position. Adjusting without a proper tensioning and alignment arrangement did not hold the belt in place.
  • The Fix and the Standard: The resolution was to add belt-run adjustment to the side plates so the belt could be steered rather than tolerated. The correction method is mechanical and worth writing down for operators: to bring a belt back, tighten the adjustment screw on the side the belt is running away from — if the belt drifts to the left, the screw on the right is tightened. The same logic applies at both ends of the run, and it is why the belts on this project are now specified with adjustment as a delivered feature rather than as an optional extra.
  • What a Buyer Should Ask For: Any aviary quote should state where belt adjustment is provided, and how many adjustment points each belt run has. A belt run with no adjustment point is a belt run that will eventually rub its own structure, and the eggs that suffer are the ones a grader later rejects.

Handover: Bilingual Notes and Operator Training

  • A Document Written in the Order the Operator Works: The handover package included bilingual installation and commissioning notes covering the scraper, the aviary structure and the central collector, written as operating orders rather than as component lists. For the egg belt the note states the correction rule directly; for the central collector it states the sequence — remove the motor covers and chains, confirm rotation on power-up, then refit. Electrical components were labelled in both languages so that an operator and a supplier technician read the same panel the same way.
  • Training Ran Alongside Trial Production: Operator training was delivered against the running line rather than in a classroom, and was repeated once the houses were in production. The record shows the split that trainers should expect: the cage frame, nest and scraper sections transfer quickly because they are sequences of visible actions, while the belt alignment, the collector chain tension and the control cabinet take longer, because they are judgement calls made against how the machine sounds and runs.
  • What the Farm Runs on Its Own Now: By the end of commissioning the farm’s own crew was carrying out day-to-day running and routine adjustment across the ten houses, and the handover notes were written to support that — including the two checks that matter most in daily operation: oil in the collector cups, and the collector chain at the correct tension.

Planning a cage free aviary system for your own site? Send us your house dimensions, the tier layout you have in mind and your target bird count, and we will return a system configuration and a discharge layout for review.

  • How many layers can one aviary house hold?
  • In this project each two-tier house was built for approximately 8,000 laying hens, on a clear floor area of 36 m by 9.2 m. The figure is a planning figure rather than an exact stocking target, and the final number depends on the bird weight the house is managed for and the local welfare rules that apply to stocking density.
  • How does a central egg collection line work?
  • Eggs roll from the nest onto a belt inside each house, and an egg elevator brings the upper tier back down to the discharge level. Each house then feeds a single conveyor, and those conveyors converge on a central collector that runs the length of the site to the egg store. The collector on this project was built in four sections, each with its own motor and chain tensioning, so a fault in one section does not stop the whole line.
  • How is manure handled in a cage free aviary house?
  • Droppings fall through a plastic slatted floor under the birds into a collection channel, so the flock never stands on fresh manure. A scraper style machine, pulled by a stainless steel cable between corner wheels, moves the material to the end of the channel. Manure belts run beneath the tiers to carry material away from the house. The scraper should be run at least once a day — a channel left to accumulate is what causes a blade to catch the wall.
  • What house dimensions does an aviary system need?
  • The house in this project was a steel structure with a 36 m clear length and a 9.2 m clear width, arranged over two tiers with a cage-frame height of 1,526 mm and tier heights of 550 mm and 650 mm. Those dimensions are not arbitrary: the clear width has to accommodate the cage rows, the bird aisles, the manure channel and the egg belt run at the same time, which is why the layout should be fixed before the building is constructed.
  • Why do egg belts drift, and how is it corrected?
  • Egg belts drift when a run has no way to steer them, and a drifting belt rubs the steelwork beneath it, which damages both belt and eggs. The correction is mechanical: tighten the adjustment screw on the side the belt is running away from, so a belt drifting to the left is corrected by tightening the screw on the right. Any aviary quotation should state where belt adjustment is provided and how many adjustment points each belt run has.

Hot Sale

Successful Cases

BEFORE YOU SEND INQUIRY

We kindly ask you to provide the following details to help us offer the most suitable solution promptly:

Your detailed input is greatly appreciated!

Get in touch Now!

Your privacy is important to us and your information will be well protected!

Boot a Zoom Meeting Now!

Get Your Customized Farming Solution

Offering customized one-stop animal farming project & technology solutions. Please fill out the following information so that we can provide you with a tailored solution: